I will do residential solar pv design, sld, 3ld, and load calculation solar permit plan
Solar Panel Layout, Solar Load Calculation, Farmland Solar, 3 Line Diagram
Sobre este Serviço
Are you a homeowner building it yourself, or a solar installer looking to scale? I provide professional, permit-ready residential rooftop PV engineering documentation so you can pass AHJ review and utility interconnection with confidence.
I specialize in creating high-quality technical plan sets that comply strictly with NEC 2026 and local fire codes. My goal is to deliver a "first-time-right" design that minimizes city revisions, saving you time and money.
️ENGINEERING SERVICES OFFERED:
- Complete Solar Permit Plan Sets
- Electrical Single-Line Diagrams (SLD) & Three-Line Diagrams (3LD)
- NEC 2026 Compliant Electrical Load Calculations
- Optimized PV Module Layouts & Roof Pitch Fire Pathways
- Battery Storage (BESS) & Hybrid System Integration
SOFTWARE UTILIZED:
AutoCAD | Helioscope | Aurora Solar (As required per project scope)
️PLEASE CONTACT ME BEFORE ORDERING to ensure project alignment. To get started, it is helpful if you have:
1. Your complete site address (for solar potential verification).
2. A clear photo of your main electrical panel's interior and its manufacturer label.
3. Your local AHJ requirements (e.g., 36-inch vs 18-inch fire setbacks).
Tipo de projeto:
Residencial
•
Comercial
Software:
PVsyst
•
AutoCAD
•
Outros
Preferência de estilo de entrega
Informe o freelancer sobre suas preferências ou preocupações em relação ao uso de ferramentas de IA na conclusão e/ou entrega de seu pedido.
Perguntas frequentes
Do you design systems with battery backups?
Yes! I can integrate Battery Energy Storage Systems (BESS) like Tesla Powerwalls or Enphase 5P into your single-line and three-line diagrams. Please select the Premium package or contact me for a custom quote.
What code standards do you follow?
All plans are designed strictly according to the latest NEC 2026 standards, along with standard International Residential Code (IRC) and International Fire Code (IFC) setback requirements. If your local city (AHJ) uses an older code (NEC 2020/2023), just let me know!

