g
gabrielrtlm

Gabriel M

@gabrielrtlm

Architect

Bolívia
Espanhol, Inglês, Português
Algumas informações são exibidas no idioma inglês.
Sobre mim
Throughout my professional career, I have adapted to different environments, both in fieldwork and office settings. The common denominator has always been ethics, strong values and principles, completing assigned tasks responsibly and with high quality standards, and working collaboratively to achieve common goals.... Saiba mais

Habilidades

g
gabrielrtlm
Gabriel M
offline • 
Tempo médio de resposta: 1 hora

Conheça meus serviços

Desenvolvimento de Conceito
I will make quantity takeoffs and cad drafting

Portfólio

Experiência profissional

Cable Car Station – Urban Transport Infrastructure Project

Doppelmayr Cable Car • Período integral

Sep 2017 - Sep 20203 yrs

Project Title: Cable Car Station – Linea Naranja (Orange Line) Location: La Paz – El Alto Metropolitan Area Client: Mi Teleférico Project Type: Public Transport Infrastructure Role: Architectural Designer / Technical Documentation Project Description This project involved the architectural development and technical detailing of a station for the urban cable car system connecting La Paz and El Alto. The work focused on producing comprehensive architectural drawings, including site plans, roof plans, construction details, and technical coordination with structural and engineering systems. The station is part of a high-capacity mass transportation network designed to address the complex topography and urban mobility challenges of the metropolitan area. Scope of Work My responsibilities included: Development of architectural plans and technical drawings Production of site layout and urban integration plans Preparation of construction detailing and drainage solutions Coordination with structural and infrastructure systems Preparation of technical documentation for construction Key Architectural Elements Integrated public access plaza Pedestrian circulation design for high passenger flow Roof and structural envelope coordination Drainage systems and detailing Urban landscaping and exterior space planning Deliverables The project documentation included: Site Plan – Access Level Roof Level Plan Architectural Details (Anchorage, Edges, Drainage Systems) Technical Construction Sections Coordination drawings for engineering disciplines Design Approach The architectural approach prioritized: Efficient passenger circulation Integration with the surrounding urban fabric Technical precision for infrastructure construction Durable materials and long-term maintenance considerations Skills Demonstrated Architectural drafting Infrastructure architecture Construction detailing Technical coordination Urban integration