a
asadbbasqs

Asad Abbas

@asadbbasqs

Road and Infrastructure Quantity Surveyor

Emirados Árabes Unidos
Inglês, Urdu
Algumas informações são exibidas no idioma inglês.
Sobre mim
I am a Quantity Surveyor with 5+ years of UAE experience in roads, infrastructure, bridges, and underpasses. I specialize in Quantity Take-Off, BOQ Preparation, Cost Estimation, Rate Analysis, Interim Payment Applications, Subcontractor Payments, Variation Claims, and Contract Administration. I can assist with accurate quantity measurements from drawings, BOQ preparation/review, new rate analysis, cost estimates, and commercial documentation. Proficient in MS Excel, AutoCAD, MS Office, and Asite. I deliver accurate, professional, and timely work.... Saiba mais

Habilidades

a
asadbbasqs
Asad Abbas
offline • 
Tempo médio de resposta: 1 hora

Conheça meus serviços

Gerenciamento de Projeto
I will prepare boq, quantity takeoff for construction

Portfólio

Experiência profissional

Roads_and Transport Authority

Quantity Surveyor

Roads and Transport Authority • Período integral

Jul 2024 - Present2 yrs 1 mo

1. Ras Al Khaimah Beach District; New Border Road Infrastructure – Phase 1 Project (E611 and E311 Connection to RAK Sector 5 Beach District) Scope of Works: The project is located in Ras Al Khaimah and comprises the development of a strategic highway corridor providing direct connectivity between E311 and Al Marjan Island. The alignment extends from E311, where a new interchange is to be constructed, up to the interface boundary with an adjoining project near the Al Hamra Industrial Area. The scope of works includes all required surveys and investigations, followed by the construction of roads, structures, utilities, cycle tracks, and all ancillary components necessary for the safe, efficient, and fully functional completion of the infrastructure. The works also include the construction of two underpasses and one bridge along E31. 2. Road and Infrastructure for Al Hamra Industrial Zone-02 Ras Al Khaimah - Phase-1A and 1B & Phase 2, 3, 4 & 5 – Zone – 02 Scope of Works: Execution of integrated infrastructure works under two contracts for the same client, covering a combined area of approximately 222 hectares. The scope includes construction of roads and pavements, along with installation of underground utility networks comprising sewer, stormwater, telecom, streetlighting, and water systems. The works also include provision and installation of ducts for irrigation, firefighting, and electrical networks, including all associated excavation, backfilling, testing, and commissioning activities. Additionally, the project involves construction of stormwater ponds and a stormwater lifting station, along with all related ancillary works for full integration with the overall drainage system. Project Value: 224 Million AED

Aldar_Properties PJSC

Assistant Quantity Surveyor

Aldar Properties PJSC • Período integral

Dec 2022 - Jul 20241 yr 7 mos

1. 17 Private Plots - Enabling Work for Nabbagh Residential Community & Construction of Road and Infrastructure for 17 Private Plots Scope of Works: Construction of infrastructure works for Nabbagh Residential Community, including demolition and site clearance, earthworks and grading, and geotechnical investigations. The scope comprises development of approximately 20 km of internal roads with associated utility crossings, stormwater drainage networks and collection pond, potable water and transmission lines, sewer networks, and streetlighting systems. Project Value: 570 Million AED

Roads_and Transport Authority

Assitant Quantity Surveyor

Roads and Transport Authority • Período integral

Aug 2021 - Dec 20221 yr 4 mos

Scope of Works: Jabal Mibrih road is mainly an existing mountainous road with sharp pins and steep longitudinal grades. The existing road need reconstruction by upgrading and improving the road geometry for both horizontal & vertical curves, which are not satisfying sight distance visibility standards. The approximate existing road length = 17 kms serving to the peak of the Mibrih mountain and to the farms. The project area lies within the Fujairah Emirate from Ch. 0+000 to 12+500 and from Ch. 12+500 till the project end lies 17+000 in Ras Al Khaimah Emirate. Project Value: 114 Million AED