a
abdullahusma306

Abdullah Usmani

@abdullahusma306
4,5(22)

Process and Layout Optimization

Paquistão
Algumas informações são exibidas no idioma inglês.
Sobre mim
I turn inefficient production floors into high-performance operations—faster, leaner, and data-driven. As an industrial engineering manager, I lead end-to-end Lean Six Sigma transformations across manufacturing lines—eliminating waste, stabilizing processes, and building systems that actually sustain results. What I do: ▸ Build Power BI dashboards that give leadership real-time visibility into KPIs, OEE, and cost deployment ▸ Implement TPM, SMED, Kaizen, across production floors ▸ Facility layout designing and optimization ▸ Process and layout simulation design for optimal results... Saiba mais

Habilidades

a
abdullahusma306
Abdullah Usmani
US$ 10/hora
offline • 
Tempo médio de resposta: 8 horas

Conheça meus serviços

Ventilação (HVAC)
I will design and improve the facility and industrial processes and layouts
4,3(13)
Fórmulas e Macros
I will design a fully automatic dashboard in excel using vba and macros
4,6(9)

Quer trabalhar com remuneração por hora?

Diga a Abdullah Usmani o que você precisa.

US$ 10

/

hora

Portfólio

Experiência profissional

Industrial Engineering manager

Stylewise Direct Limited • Período integral

Nov 2021 - Present4 yrs 6 mos

Lead 10+ Lean Six Sigma (DMAIC) projects across production lines, targeting waste elimination and process variation reduction ▸ Developed Power BI and Excel dashboards adopted by senior leadership to monitor OEE, line efficiency, and cost deployment KPIs in real time ▸ Implemented SMED programs, reducing changeover time by 10% across 78 production lines, directly improving machine utilization ▸ Drove TPM and 6S rollout across departments, improving equipment reliability and reducing unplanned downtime ▸ Conducted Gemba walks and Root Cause Analysis (RCA) sessions to identify systemic losses — translating findings into sustainable countermeasures with measurable results ▸ Trained and coached 78 supervisors and 2,200 operators on Lean principles, standard work, and autonomous maintenance — building internal capability for continuous improvement ▸ Managed cross-functional improvement projects using PMP principles, ensuring on-time delivery, stakeholder alignment, and scope control ▸ Redesigned production floor layouts to enable linear workflow, reducing material travel distance and improving throughput rate ▸ Implemented 5S + Audit systems across departments, achieving sustained workplace organization standards ▸ Led process digitalization initiatives, replacing manual tracking with automated data collection tools — reducing reporting time significantly ▸ Conducted SAM/SMV calculations and line balancing studies to optimize workforce deployment and eliminate bottlenecks ▸ Executed Quick Changeover (SMED) and TPM programs to reduce downtime and improve Overall Equipment Effectiveness (OEE)

22 Avaliações
4,5

(17)
(3)
(1)
(1)
(0)
Classificação detalhada
  • Nível de comunicação do freelancer
    4,4
  • Qualidade da entrega
    5
  • Valor da entrega
    4,8
1-5 fora das 22 avaliações
Ordenar por
Mais relevante
    E

    engstudentttiae

    Cliente recorrente

    SA

    Arábia Saudita

    5

    Attention to details

    US$ 100-US$ 200

    Preço

    4 dias

    Tempo

    gig

    Ventilação (HVAC)

    Útil?
    Sim
    Não
    E

    engstudentttiae

    Cliente recorrente

    SA

    Arábia Saudita

    5

    Professionalism of work and went beyond

    Até US$ 50

    Preço

    6 dias

    Tempo

    gig

    Ventilação (HVAC)

    Útil?
    Sim
    Não
    V

    vleads

    Cliente recorrente

    GB

    Reino Unido

    5

    Great work, I loved the way you handled everything. Thank you!

    Até US$ 50

    Preço

    1 dia

    Tempo

    gig

    Fórmulas e Macros

    Útil?
    Sim
    Não
    V

    vleads

    Cliente recorrente

    GB

    Reino Unido

    4,3

    A great job delivered. There's good communication and understanding. I will work with him again and I recommend him to anyone that needed his assistance. Thank you!

    Até US$ 50

    Preço

    4 dias

    Tempo

    gig

    Fórmulas e Macros

    Útil?
    Sim
    Não
    N
    image-docs

    narimilani

    MT

    Malta

    5

    verry good verry good

    Até US$ 50

    Preço

    1 dia

    Tempo

    gig

    Fórmulas e Macros

    Útil?
    Sim
    Não